The rubber dam was placed and the working field disinfected with chlrhexidine-ethanol solution. The canal was perforated with a high speed diamond, size 25 Flexoreamer was inserted into the canal to the length previously measured from the preoperative radiograph and a working length was determined by the help of an apex-locator and a working length radiograph.

Go Up to Parent Topic Go to Module Main Page Go to Library
  Start Lecture Editor and Player