The crown and the post were removed, the rubber dam placed on the root, and the canal was instrumented after removing the old root canal filling with files and chloroform. At this stage a second canal was found and instrumented to size 45 with reamers and Hedstroem files.

Go Up to Parent Topic Go to Module Main Page Go to Library
  Start Lecture Editor and Player