Four weeks later the tooth was filled with gutta-percha and sealer with nr. 70 gutta-percha as a master point. The tooth had been symptomfree during the whole treatment. A prosthetic crown with a post was prepared.

Go Up to Parent Topic Go to Module Main Page Go to Library
  Start Lecture Editor and Player