Infiltration anesthesia was applied and the crown was perforated with a high speed diamond bur (through porcelain) and with a hard metal high speed round bur (through the metal) under water cooling. Access cavity was finished and the canal openings of four canals were located. The rubber dam was applied and the working disinfected with chlorhexidine-ethanol solution.